Operation Sequence - Champion DH6000 Operation, Cleaning, And Maintenance Manual

Hot water sanitizing machine w/fresh water rinse and built-in stainless steel electric booster/ventless heat recovery
Hide thumbs Also See for DH6000:
Table of Contents

Advertisement

Operation

Operation Sequence

5
SELECT CYCLE
Touch to Change
WASH TEMP
150
When READY appears, touch the SELECT
CYCLE button to choose a cycle. Each touch
advances the cycle time between 1, 2, 4,
NOTE: A cycle may be selected before
or after the door is closed. Cycle starts
when door is closed.
7
1 MIN CYCLE
Touch to Change
WASH TEMP
150
When the CYCLE is selected, the machine
starts and 'WASHING' is displayed.
9
1 MIN CYCLE
Touch to Change
WASH TEMP
150
'DWELLING' is displayed as the
16 sec. DWELL begins.
6
(continued)
READY
and 6 minutes.
WASHING
DWELLING
35
TIME REMAINING
6
Scrap and load wares into dish rack.
Wash one rack at a time and do not
overload the rack. Slide the rack
into the machine and close the doors.
8
1 MIN CYCLE
Touch to Change
RINSE TEMP
185
At the end of the wash cycle the 10 sec.
final rinse begins. The RINSE TEMP display
must read between 185-195°F. Check
pressure gauge to ensure 18-20 PSI
during final rinse cycle.
10
1 MIN CYCLE
Touch to Change
WASH TEMP
150
(For VHR
only),'RECOVERY' is displayed as
the heat recovery fan runs for 30 secs. to
remove steam and recover
RINSING
49
TIME REMAINING
RECOVERY
29
TIME REMAINING
heat.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dh6000-vhr

Table of Contents