Assembly - ProMinent Hydro/4 HP4a Operating Instructions Manual

Metering pump
Table of Contents

Advertisement

Assembly

6
Assembly
Install the motor - with designs without
motor
32
Compare the dimensions on the dimensional
drawing with those of the pump.
1.
Select a suitable motor - it must correspond to the data for one of
the motors from the "Motor data" table - see Chapter "Technical
data".
WARNING!
EX is relevant in areas at risk from explosion!
2.
Fit the motor correctly on the flange (qualified personnel).
Observe the coupling operating instructions!
WARNING!
EX is relevant in areas at risk from explosion!
With a claw coupling: The claw on the motor shaft must be fixed at
the correct height, see corresponding figure and table.
3.
As you have converted an "incomplete machine" into a complete
machine, you must perform a conformity assessment, risk assess‐
ment, issue an EC Declaration of Conformity, fit your own company
nameplate, ... .
4.
With ATEX pumps: additionally perform an ignition hazard assess‐
ment.
5.
Complete the pump documentation / operating instructions.

Advertisement

Table of Contents
loading

Table of Contents