VERSION 11/2015
OPERATING MANUAL
Safe operation of the EvoMotion pump is only guaranteed with a ground connection.
Connect all ground cables using a short and direct route.
Procedure:
1
Screw on grounding cable with eye.
2
Clamp the grounding cable to a grounding connection on site.
3
Ground the product (paint) tank to an on-site grounding connection.
4
Ground the other parts of the system to an on-site grounding connection.
Ex zone
All devices and equipment must be suitable for use in potentially explosive areas.
B_04107
ORDER NUMBER DOC2333553
Grounding cable
31