Securing Cc1300 For Loading - Fayat Group DYNAPAC CC1300 Translation Of Original Instruction Manual

Table of Contents

Advertisement

Roller loaded in forward
direction
Direct of travel
1 - 2
1 - 2
= double lashings, i.e. one lashing with two parts secured to two different lashing mounts,
= double lashings, i.e. one lashing with two parts secured to two different lashing mounts,
3 - 4
3 - 4
symmetrically located on the right and left sides.
symmetrically located on the right and left sides.
5
5
= rubber
= rubber
(1 - 4: Double lashings, LC at least 1.7 tonnes (1700 daN), S
(1 - 4: Double lashings, LC at least 1.7 tonnes (1700 daN), S
Double L
Double L
- L
- L
1
1
0,6 - 3,0
0,6 - 3,0
The distance L
The distance L
above is between points D and E. D is the projected point directly at right angles laterally in relation to
above is between points D and E. D is the projected point directly at right angles laterally in relation to
1
1
the edge of the platform from the lashing mount C on the roller. E is the lashing mount at the edge of the platform. L
the edge of the platform from the lashing mount C on the roller. E is the lashing mount at the edge of the platform. L
L
L
have a corresponding relationship.
have a corresponding relationship.
3
3
2021-12-14
The lashings' permitted distance interval in meters
The lashings' permitted distance interval in meters
Double L
Double L
2
2
4812162001_D.pdf

Securing CC1300 for loading

Securing the CC1300 vibratory roller from Dynapac for
transport.
- L
- L
3
3
4
4
0,1 - 3,0
0,1 - 3,0
Miscellaneous
300 kg (300daN))
300 kg (300daN))
TF
TF
2
2
59

Advertisement

Table of Contents
loading

Table of Contents