PLUMB AND LEVEL EACH FRAME POD—continued
3. At the end walls, adjust the levelers to level the frame side-to-side. Set a level on the end frame cross member and adjust. See diagram C.
STEP 3
DIAGRAM C
4. Repeat Step 2 to recheck the back-to-front slope.
5. Verify that all levelers are locked in place. For improved stability, avoid fully extending the levelers.
6. Assemble and set the next pod in position and repeat this procedure (Procedure 5).
7. After all pod frames are assembled, set in place, leveled, and plumbed, install the 112770 finishing plug in the top of each vertical frame tube.
8. Continue with the installation of the gutters and downspouts.
Revision date: 09.21.18
112712
Plumb and Level Each Frame Pod
Lock Nut
Install one 112770 finishing cap in the top of each vertical
frame tube. Gently tap into tube if needed.
112770
13