Completing The Installation; Completing The Installation Of A New System - Enterasys Matrix 7G4202-72 Hardware Installation Manual

Dfe-platinum series
Hide thumbs Also See for Matrix 7G4202-72:
Table of Contents

Advertisement

Pin Out Descriptions
RJ45
Pin
1
2
4
5
6
8

Completing the Installation

Completing the DFE module installation depends on if the module is being installed in:
a new DFE module system (refer to "Completing the Installation of a New System" on 
page 3‐17), or
an established, operating DFE module system (refer to "Completing the Installation of a 
DFE‐Platinum Module in an Existing System" on page 3‐19).

Completing the Installation of a New System

In a new system of DFE modules, one of the installed DFE modules will become the management 
module on chassis power up, and all DFE modules will automatically be set to the factory default 
values. A complete list of the factory default values are provided in Chapter 3 of the Enterasys 
Matrix DFE‐Platinum Series Configuration Guide.
After installing all DFE‐Platinum modules into the host chassis and making the connections to the 
network, proceed to the following First‐Time Log‐In Using a Console Port Connection procedure 
to access the module management startup screen from your PC, terminal, or modem connection.
First-Time Log-In Using a Console Port Connection
Modem Port Adapter Wiring and Signal Diagram
Conductor
Blue
Orange
Red
Green
Yellow
Gray
Note: This procedure applies only to initial log-in, and to logging in to a device not yet configured
with administratively-supplied user and password settings.
By default, the Matrix DFE Series device is configured with three user login accounts: ro for Read-
Only access; rw for Read-Write access; and admin for super-user access to all modifiable
parameters. The default password is set to blank (press Enter). For information on changing these
default passwords, refer to Chapter 3 in the Enterasys Matrix DFE-Platinum Series Configuration
Guide
.
DB25
Pin
Signal
2
Transmit (TX)
8
Data Carrier Detect (DCD)
3
Receive
7
Ground (GRD)
20
Data Terminal Ready (DTR)
22
Ring Indicator
DFE-Platinum Series Hardware Installation Guide 3-17
Completing the Installation

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Matrix 7g4282-49

Table of Contents