Download Print this page

Introduction - Shimadzu iMLayer Installation Requirements

Matrix vapor deposition system

Advertisement

ZEBV-5088C

1. Introduction

These Pre-Installation Requirements describe the requirement to facilitate installation of the iMLayer. To
keep the instrument stable, please make prior arrangement in accordance with these requirements. They
can also be used for routine maintenance. This instrument consists of a main unit used for vapor
deposition of the matrix, a deposition power supply used to supply power to the boat for vapor deposit, and
a vacuum pump used to evacuate the inside the chamber of iMLayer.
3

Advertisement

loading
Need help?

Need help?

Do you have a question about the iMLayer and is the answer not in the manual?