Assembly Instructions; Required Tools; Shipping List - Brave MVH1334C Owner/Operator And Safety Manual

34 ton vertical / horizontal log splitter
Table of Contents

Advertisement

Assembly Instructions

Required Tools

• 10" crescent wrench
• Flat head screwdriver
• Two 1/2'' open end wrenches
• Two 3/4" open end wrenches
• Funnel
• Pliers
• Band cutters

Shipping List

The following chart contains the list of parts that should be shipped as part of the VH1334
Log Splitter.
Qty
Description
1
Base Unit (engine)
1
Rail Unit (hydraulic cylinder)
2
1
Oil Filter
Hitch Assembly Parts
1
Hitch Coupler (2")
2
Bolt (1/2-13 x 3-1/2")
2
Locknut (1/2-13)
2
Safety Chain
2
Safety Quick-Link
Tongue and Front Leg Assembly
1
Tongue and Front Leg Weldment
2
Bolt (1/2-13 x 3-1/2")
2
Locknut (1/2-13)
Rail Latch Assembly
1
Rail Rest Weldment
2
Bolt (1/2-13 x 1-1/2")
2
Lockwasher (1/2")
2
2
Nut (1/2-13)
1
On the pallet.
2
In cardboard box.
800-350-8739
1
1
2
2
2
2
2
2
2
2
2
ty
Rail to Base Assembly
2
Bolt (1/2-13 x 1-1/2")
2
Lockwasher (1/2")
2
Nut (1/2-13)
Valve Assembly
1
Control Lever (valve)
1
Chain Link
1
Clevis Pin
1
Cotter Pin
Fender Assembly
1
2
Fender
4
Bolt (5/16-18 x 3/4")
4
Locknut (5/16-18)
Jack Assembly
1
Jack with Wheel
2
Mounting Straps
4
Bolt
4
Locknut
9
Description
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Brave

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vh1334gxVh1334vn

Table of Contents