Operating Power - Honeywell Notifier RP-2001 Instruction Manual

Pre-action/deluge control panel
Table of Contents

Advertisement

Installation

2.2 Operating Power

CAUTION:
!
SEVERAL DIFFERENT SOURCES OF POWER CAN BE CONNECTED TO THIS PANEL.
DISCONNECT ALL SOURCES OF POWER BEFORE SERVICING. THE PANEL AND
ASSOCIATED EQUIPMENT MAY BE DAMAGED BY REMOVING AND/OR INSERTING CARDS,
MODULES OR INTERCONNECTING CABLES WHILE THIS UNIT IS ENERGIZED.
Primary Power Source (AC) and Earth Ground Connections
AC power connections are made inside the control panel cabinet. The primary power source for the
panel is 120 VAC, 60 Hz, 3.66 amps for the RP-2001/C or 240 VAC, 50/60 HZ, 2.085 amps for the
RP-2001E. Run a pair of wires (with ground conductor) from the protected premises main breaker
box to the AC terminal block TB1 on the main power supply As per the National Electrical Code,
use 14 AWG (2.00 mm
equipment may be connected to this circuit. In addition, this circuit must be provided with
22
Figure 2.3 Backbox
DISCONNECT ALL POWER BEFORE SERVICING
2
, 1.6 mm O.D.) or heavier gauge wire with 600V insulation. No other
RP-2001 Series Manual — P/N 52985:D5 1/26/2017
Operating Power

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Notifier rp-2001eNotifier rp-2001c

Table of Contents