Customer-Supplied Pipe Nipple Analyzer Mounting - Ametek WDG-V User Manual

Combustion analyzer
Table of Contents

Advertisement

Customer-Supplied Pipe Nipple Analyzer Mounting

If you can't mount the analyzer flush with the process as described under
"Analyzer Flush Mounting (Preferred Method)" – for example, the process wall
is curved sharply, covered with insulation, or obstructed with reinforcing mem-
bers – you can instead:
1. Weld a short 8.89 cm (3 1/2") diameter pipe nipple to the process wall and
2. Weld the 17.78 cm x 19.37 cm (7" x 7 5/8") supplied plate to the end of the
3. Wrap the nipple with at least 2.54 cm (1") weatherproof insulation and
4. Bolt the analyzer to the plate.
If mounting the analyzer using this method, you can also install the probe
heater to minimize the possibility of the sample gas cooling below its dew-
point.
Figure 2-7.
WDG-V Analyzer pipe nipple
mount.
2-14 | Thermox
®
WDG-V / VC / VCM / VM
make sure to extend the nipple through the skin of the process (see Figure
2-7).
nipple, taking care to center it over the hole.
heat trace it.
Sensor bolted to mounting plate after
plate is welded to nipple by customer.
SIDE VIEW
Gasket (By Ametek)
Mounting plate (supplied by Ametek)
1 7/8"OD with 9"long nipple (7.30cm
x 22.89cm) welded over 3 3/4"OD
(9.52cm) hole by customer.
Required 1" (25.4cm) minimum
insulation around exposed portion
of nipple
Pipe nipple
(supplied by customer)
Single stud at
12 o'clock position
Proper orientation for
mounting plate and flange
PN 9000-133-VE, Rev U
Process wall
Probe