HYOSUNG MoniMax 5600T Operator's Manual page 144

Table of Contents

Advertisement

MoniMax 5600T
● Tools required for installation
In order to move the machine and place it in a proper location, you should seek the help of
professionals trained in moving heavy equipment.
Following tools are needed to install the machine.
- Wire cutter
- Lifter
- Screw driver (Flat, Phillips)
- Wrench (Spanner)
- Leveling tool
G.3 How to Install this ATM at Customer Site
● Unpacking
1) Unpack the machine on top of the palette.
2) Cut the straps that are fastened around the box with a knife.
(Be careful when cutting the straps.)
3) Use an appropriate tool to remove the nails from the palette.
4) Remove the lid, then box from the top. Do not discard the packaging materials until you have
verified any shipping damage claim. Contact your distributor immediately if you see any shipping
damage.
Store the box in a safe place to re-use or discard of appropriately.
5) Verify the contents carefully with the packing list to be sure all items listed are included. Notify
your distributor of any shortages.
6) If only the palette needs to be removed, lift the whole machine from the bottom and set it aside.
6 - 49
6. Appendix

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents