Three Phase Power Connections - R&M LOADMATE LM16 Installation And Maintenance Manual

Table of Contents

Advertisement

LM16-20-25 I&M MANUAL/EN/11.30.2010
2.7

Three Phase Power Connections

Figure 2. Three Phase Control Box Power Connections
PS – Power supply
TR – Trolley connection
PB – Pushbutton connection
1. Remove the control enclosure cover.
2. Insert the power supply cable through the cable gland or connector (PS).
3. Connect phases L1, L2, L3, and ground (PE) to terminal strip. Refer to the wiring diagram.
4. Tighten the terminal screws
5. Tighten the cable gland or connector to secure the cable.
6. Connect the pushbutton assembly to plug connector X23 (PB).
7. Connect the motorized trolley plug connector X24 (TR) (optional).
8. Close the control enclosure cover.
R&M Materials Handling, Inc. | 4501 Gateway Boulevard, Springfield, Ohio 45502 | PH: 1-937-525-5100 | FAX: 1-937-325-5319
This document and the information contained herein, is the exclusive property of R&M Materials Handling, Inc., and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of R&M Materials Handling, Inc.
Copyright © (2010) R&M Materials Handling, Inc. All rights reserved.
PS
TR
PB
12/73

Advertisement

Table of Contents
loading

This manual is also suitable for:

Loadmate lm20Loadmate lm25

Table of Contents