Three Phase Power Connections - R&M LOADMATE LM Series Installation And Maintenance Manual

Table of Contents

Advertisement

LM01 I&M MANUAL/EN/11.30.2010
2.6

Three Phase Power Connections

Figure 2. Three Phase Control Box Power Connections
1. Remove control box cover.
2. Insert power supply cable through cable gland or assemble to (optional) plug.
3. Connect power leads L1, L2, and L3 to relay K21.
4. Connect ground wire PE (GRD) to terminal strip (2). Refer to wiring diagram.
5. Tighten terminal screws.
6. Tighten cable gland or (optional) connector to secure power cable.
7. Replace control box cover.
8. Attach pushbutton assembly to plug connection X23.
12/65
This document and the information contained herein, is the exclusive property of R&M MATERIALS HANDLING, INC. and represents a non-public, confidential and proprietary trade secret
that may not be reproduced, disclosed to third parties, altered or otherwise emplo yed in any manner whatsoever without the express written consent of R&M MATERIALS HANDLING, INC.
Copyright © (2010) R&M MATERIALS HANDLING, INC. All rights reserved.

Advertisement

Table of Contents
loading

Table of Contents