Installing The Load Chain - R&M LOADMATE LM16 Installation And Maintenance Manual

Table of Contents

Advertisement

LM16-20-25 I&M MANUAL/EN/11.30.2010
6.8

Installing the Load Chain

Figure 13. Chain Installation
1-FALL CHAIN INSTALLATION
1. Obtain an electric wire approximately 20 inches (50 cm) in length.
2. Insert the wire into the chain guide and push it through to the other side of the guide.
3. Hook the chain onto the end of the electric wire on the chain container side.
4. Pull on the wire to bring the chain into contact with the chain wheel. Refer to Figure 13-A for chain
orientation.
m
CAUTION: Make sure the chain weld on chain link faces out from chain wheel
pocket on hoist load sprocket. See Figure 13 (drawing 1/2).
5. Run hoist "DOWN" in slow speed to feed chain through chain sprocket and out other side.
6. Attach load block assembly on end of load chain. Attach fall stop at least 6.0 inches (150 mm) from the
end of the chain (on the chain container side). Refer to Figure 14 for details.
7. Make sure that load chain is not twisted or deformed.
8. Attach chain container.
R&M Materials Handling, Inc. | 4501 Gateway Boulevard, Springfield, Ohio 45502 | PH: 1-937-525-5100 | FAX: 1-937-325-5319
This document and the information contained herein, is the exclusive property of R&M Materials Handling, Inc., and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of R&M Materials Handling, Inc.
Copyright © (2010) R&M Materials Handling, Inc. All rights reserved.
Figure 13-A. Chain Orientation
31/73

Advertisement

Table of Contents
loading

This manual is also suitable for:

Loadmate lm20Loadmate lm25

Table of Contents