Life Fitness Axiom OP-SLCE Assembly Instructions Manual page 19

Seated leg curl/extension
Table of Contents

Advertisement

4. Install nuts and washers securing the increment weight guide rods to the top plate of the tower frame using a 7/16"
wrench.
5. Route cable up through the top of the tower frame and down through the side tube of the frame.
Item
1
2
3
Increment Weight Guide Rod
Tighten hardware to 16-20 in-lb (1.8-2.2 Nm).
Item
1
Page 17 of 41
Description
Nut, ¼" Nylock
Washer, Flat ¼" ID
Description
Cable
Qty.
2
2
2
Qty.
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents