Life Fitness Axiom OP-SLCE Assembly Instructions Manual page 16

Seated leg curl/extension
Table of Contents

Advertisement

3. Install screws, washers, and locknuts securing the pivot boom assembly to the main frame assembly using an 8mm
Allen wrench and 17mm wrench.
4. Install hole plugs to the main frame assembly using a rubber mallet.
5. Install screws, washers, and locknuts securing the bottom cross brace to the tower frame using an 8mm Allen
wrench and 17mm wrench.
6. Install hole plugs to the tower frame.
Item
1
2
3
4
5
Nut, M10 x 1.5, Hex Nylock
Tighten hardware to 20-25 ft-lb (27.1-33.9 Nm).
Item
1
2
Item
1
2
3
4
5
Nut, M10 x 1.5, Hex Nylock
6
Page 14 of 41
Description
Pivot Boom Assembly
Main Frame Assembly
Screw, M10 x 1.5, 30mm
Washer, Flat 3/8"
Description
Main Frame Assembly
Hole Plug, 1"
Description
Bottom Cross Brace
Tower Frame
Screw, M10 x 1.5, 110mm
Washer, Flat 3/8"
Hole Plug, ½"
Hand tighten hardware.
Qty.
1
1
4
8
4
Qty.
1
4
Qty.
1
1
2
4
2
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents