To wire a compressor safety input to the controller
NOTES
•
An isolation relay may be required if the RTU Open is powered separately from the equipment's control power
circuit.
•
Follow device manufacturer's installation and operating instructions.
Wiring an occupancy switch or door contact
Occupancy switch - field-supplied
Door contact - field-supplied
Occupancy or door contact switches may be installed to provide an alternate means of occupancy determination
or heating and cooling lockout. See Sequence of Operation (page 44) for additional details.
Wiring specifications
Cable from sensor to controller:
Maximum length:
RTU Open v3
Installation and Start-up Guide
If <100 ft (30.5 meters)
If >100 ft (30.5 meters)
500 feet (152 meters)
39
Installing the RTU Open
22 AWG, unshielded
22 AWG, shielded
CARRIER CORPORATION ©2019
All rights reserved