Crestron Isys TPS-3100L Operation Manual page 12

6.4 inch lectern/wall mounted touchpanel
Hide thumbs Also See for Isys TPS-3100L:
Table of Contents

Advertisement

6.4" Lectern/Wall Mounted Touchpanel
8 • 6.4 Inch Lectern/Wall Mount Touchpanel: Crestron Isys® TPS-3100L
Downloads | Product Manuals | Wiring Diagrams section of the Crestron website
(www.crestron.com).
NOTE: Do not power up system until all wiring is verified. Care should be taken to
ensure data (Y, Z) and power (24, G) connections are not crossed.
When calculating the wire gauge for a particular Cresnet run, the length of the run
and the power factor of each Cresnet unit to be connected must be taken into
consideration. If Cresnet units are to be daisy-chained on the run, the power factor of
each network unit to be daisy-chained must be added together to determine the
power factor of the entire chain. The length of the run in feet and the power factor of
the run should be used in the following resistance equation to calculate the value on
the right side of the equation.
Resistance Equation
40,000
R < L x PF
The required wire gauge should be chosen such that the resistance value is less than
the value calculated in the resistance equation. Refer to the table after this paragraph.
Wire Gauge Values
RESISTANCE (R)
4
6
10
15
13
8.7
NOTE: All network wiring must consist of two twisted pairs. One twisted pair is
the +24V conductor and the GND conductor. The other twisted pair is the Y and Z
conductors.
NOTE: When daisy-chaining Cresnet units, strip the ends of the wires carefully to
avoid nicking the conductors. Twist together the ends of the wires that share a pin on
the network connector, and tin the twisted connection. Apply solder only to the ends
of the twisted wires. Avoid tinning too far up the wires or the end becomes brittle.
Insert the tinned connection into the Cresnet connector and tighten the retaining
screw. Repeat the procedure for the other three conductors.
NOTE: For larger networks (i.e., greater than 28 network devices), it may become
necessary to add a Cresnet Hub/Repeater (CNXHUB) to maintain signal quality
throughout the network. Also, for networks with lengthy cable runs, it may be
necessary to add a Hub/Repeater after only 20 devices.
Crestron Isys
Where:
R = Resistance (refer to table below).
L = Length of run (or chain) in feet.
PF = Power factor of entire run (or chain).
WIRE GAUGE
16
18
20
22
Doubled CAT5
Tripled CAT5
Operations Guide – DOC. 6291
®
TPS-3100L

Advertisement

Table of Contents
loading

Table of Contents