Chapter 3: Delivery And Handling; Delivery And Handling - Branson Sonifier SLPt User Manual

Cell disruptor
Table of Contents

Advertisement

SLPt Cell Disruptor
User Manual

Chapter 3: Delivery and Handling

3.1 Delivery and Handling

The SLPt Cell Disruptor has no special handling constraints. On receipt of your SLPt, take the following
steps:
1.
Inspect the carton for signs of damage.
2.
Open the carton and locate the packing list.
3.
Carefully unpack the components and check them against the packing list.
4.
Save all packing materials in case the equipment needs to be shipped.
5.
Inspect the components for any damage that may have occurred during shipping.
Report all shipping damage to your carrier.
100-214-252 Rev. A
DOC EXPIRES 12PM 9/16/2007. Article or Material must comply with the requirements
stipulated by RoHS in its current version of 1/27/03
Chapter 3: Delivery and Handling
Delivery and Handling
3-1

Advertisement

Table of Contents
loading

Table of Contents