Checklists
14.3

Startup and parameterization

Device type/equipment identification
Version: HW/FW
Editor
Remark
No. Requirement (mandatory)
1
Was startup completed according to the specifications (specifications
from the planning phase or according to the application description)?
2
During startup, is it ensured that any person starting hazardous move-
ments intentionally can only do so with a direct view of the danger zone?
3
Are all parameters parameterized for the outputs and is the F_WD_Time
set correctly?
4
For outputs that are parameterized for two-channel operation, are both
channels parameterized correctly for each other?
5
Are the output test pulses parameterized according to the actuator to be
connected?
6
Has the switch-off delay for stop category 1 been observed in the calcu-
lation of the total response time for the machine/system?
No. Requirement (optional)
7
Have safety distances that must be observed been calculated according
to the response and delay times implemented?
IndraControl S20 Module With Safe Digital Outputs S20-PSDO-8/3
Checklist for startup and parameterization of the module
DOK-CONTRL-S20*PSDO*8*-AP02-EN-P
Date
Test engineer
Yes
Remark
Yes
No Remark
Date
Signature (editor)
Date
Signature (test engineer)