Checklists - Bosch Rexroth IndraControl S20 Manual

Hide thumbs Also See for Rexroth IndraControl S20:
Table of Contents

Advertisement

DOK-CONTRL-S20*PSDO*8*-AP02-EN-P
IndraControl S20 Module With Safe Digital Outputs S20-PSDO-8/3
14

Checklists

Device type/equipment identification
Version: HW/FW
Test engineer 1
Remark
No. Requirement (mandatory)
X
No. Requirement (optional)
Y
Key:
Equipment identification
Version: HW/FW
Date
Editor
Test engineer
Remark
Requirement (mandatory)
Requirement (optional)
The checklists listed in this chapter provide support when carrying out the follow-
ing tasks on the S20-PSDO-8/3 module: planning, assembly and electrical instal-
lation, startup, parameterization, and validation.
These checklists may be used as planning documentation and/or as
verification to ensure the steps in the specified phases are carried out
carefully.
Archive the completed checklists to use as reference for recurring tests.
The checklists do not replace the validation, initial startup, and regular testing per-
formed by qualified personnel.
The following section of a checklist shows an example of a completed checklist.
Checklist . . .
00/101
John Smith
System XXX has been checked for engine hood production
. . .
. . .
Enter the device type and/or the equipment identification for the relevant module.
Enter the hardware and firmware version of the module: see
Enter the date on which you began to fill in this checklist.
Enter the name of the editor.
Enter the name of the test engineer.
Enter a remark, if necessary.
These requirements must be met for a safety application, in order to complete the relevant
phase using the checklist.
These requirements are optional. For points that are not met, please enter an appropriate re-
mark in the relevant field.
S20-PSDO-8/3 / S20-PN-BK+
Date
Test engineer 2
Yes
Yes
No Remark
Bosch Rexroth AG
Checklists
2008-01-03
Jane Brown
Remark
"Structure of the
module".
69/82

Advertisement

Table of Contents
loading

Table of Contents