JRC JLN-900 Installation And Instruction Manual page 78

Speed log
Table of Contents

Advertisement

4.
Mount the Nut, Locking Washer/Circlip, Washer and O-ring onto the Connecting
Tube strictly in the order shown below.
Mounting Sealing items
Sealing items mounted – Ready for Cable insertion
5.
Uncoil and lay out the complete length of the Transducer cable to make it available for
insertion through the Connecting Tube.
Maintain transport protection on the Transducer Head as far as possible and be careful
during mounting procedures.
It is recommended to temporarily wrap the termination pins with insulation tape to
ease insertion and for protection throughout the installation work.
If necessary partly disassemble the Cable Gland to make it easier to feed the
termination pins through the Gland.
Carefully feed the cable end through the tube and through the Cable Gland.
Re-assemble the Cable Gland when a short length of the cable is passed through.
Do not tighten the Cable Gland at this stage.
Pull the complete length of cable through the tube.
4-40

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents