Setting Up The Instrument - R&S NGA100 Series Getting Started

Table of Contents

Advertisement

®
R&S
NGA100
● Two 115 V fuses (replace the preloaded fuses with these fuses depending on
the mains voltage, see
on page 21 for more information)
● One 5-pin plug for digital I/O port connection
● One 8-pin terminal block plug for output connection
● One Getting Started manual
● One document folder containing Basic Safety instructions guide, KC and CE
certificate
3.4

Setting Up the Instrument

The R&S NGA100 is designed for benchtop and rackmount.
3.4.1
Bench Operation
On a benchtop, the R&S NGA100 can either lie flat or stand on its feet. As shown
in
Figure
3-1, feet on the bottom can be folded out to set the instrument in an
inclined position.
Figure 3-1: Operating positions
Positioning of instrument
The instrument must be positioned in a manner that allows the user to dis-
connect the unit from the mains at any time and without restrictions.
Getting Started 5601.8902.02 ─ 06
Chapter 4.2, "Switching On the
Putting into Operation
Setting Up the Instrument
Instrument",
14

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nga102Nga141Nga142Nga101

Table of Contents