Putting Into Operation - R&S NGA100 Series Getting Started

Table of Contents

Advertisement

®
R&S
NGA100
3

Putting into Operation

This chapter describes the steps to set up the R&S NGA100 for the first time.
Risk of injury and instrument damage
The instrument must be used in an appropriate manner to prevent electric
shock, fire, personal injury, or damage.
● Do not open the instrument casing
● Read and observe the "Basic Safety Instructions" delivered as a printed
brochure with the instrument. Note that the basic safety instructions also
contain information on operating conditions that prevent damage to the
instrument
In addition, read and observe the safety instructions in the following sec-
tions. Notice that the data sheet may specify additional operating condi-
tions.
Risk of instrument damage during operation
An unsuitable operating site or test setup can cause damage to the instru-
ment and the connected devices. Ensure the following operating conditions
before you switch on the instrument:
● The instrument is dry and shows no sign of condensation
● The instrument is positioned as described in
Operation",
● The ambient temperature does not exceed the range specified in the
data sheet
● Voltage levels at the input connectors are all within the specified ranges
● Voltage outputs are correctly connected and not overloaded
Getting Started 5601.8902.02 ─ 06
on page 14
Putting into Operation
Chapter 3.4.1, "Bench
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nga102Nga141Nga142Nga101

Table of Contents