Setting Up The Instrument; Bench Operation - R&S NGE102B Getting Started

Hide thumbs Also See for NGE102B:
Table of Contents

Advertisement

®
R&S
NGE100B
● One document folder containing Basic Safety instructions guide and CE certif-
icate
5.4

Setting up the instrument

The R&S NGE100B is designed for benchtop and rackmount.
5.4.1

Bench operation

On a benchtop, the R&S NGE100B can either lie flat or stand on its feet. As
shown in
Figure
an inclined position.
Figure 5-1: Operating positions
Positioning of instrument
The instrument must be positioned in a manner that allows the user to dis-
connect the unit from the mains at any time and without restrictions.
Getting Started 5601.1337.02 ─ 08
5-1, feet on the bottom can be folded out to set the instrument in
Putting into operation
Setting up the instrument
16

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nge103b5601.3800.025601.3800.03

Table of Contents