Switching motion orbital to reciprocal in SK-71
-
-
Lower Spacer Install
Position
3. Install M5*35L, Spacer (13mm, spanner) to the lower vibrating frame.
The lower vibrating frame is designated to move as the reciprocating motion.
4. Reinstall the Shaking table onto the unit in the reverse order.
Page 28
Shaking Table
Shaking Table
- Remove the universal platform and miscellaneous
accessories from the Shaking table.
- Keep the working area enough for assembling.
- Follow the next instructions.
1. Remove the Shaking table from the unit.
Remove M5x8, flat head bolt(+, screw driver)
from the Shaking table.
2.
from the upper vibrating frame.
Figure ? [Inside of Vibrating Frame]
It may cause serious damage to the unit if
it¡s too much forced to install above parts.
Remove M5*35L, Spacer (13mm, spanner)
Upper Vibrating Frame
Lower Vibrating Frame
Lower Spacer Install
Position