Jeio tech Lab Companion SK-300 Operating Manual page 33

Shaker
Table of Contents

Advertisement

5. Now then, make sure that there will be the vibrating frame set and the system unit
in the unit. (See Figure #3).
6. You can see 4 ea M5x10mm, wrench bolt under the Hole after spinning out the rotary spin
set(G).(See Figure #4).
H. Rotary Spin Set
[Figure #5]
7. After turning Rotary Spin Fin (H) in the position of Driving Wheel, There is 4 ea
M5X10mm, wrench bolt under the Hole. (See Figure #5)
8. Remove 4ea M5X10mm, wrench bolt (4mm, wrench handle). Rotary Sin Set (H) will be
separated. (See Figure #6)
9. Fit and fix out the rotary spin set into the stroke fixture hole after setting it
to the position. To be desired for the right stroke which can be possible into 20,
30 or 40mm.
10. Reinstall the shaking table into the unit in the reverse order.
I. Wrench bolt
Driving Wheel Set
[Figure #6]
Stroke Fixture Hole
Page 33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lab companion sk-600Lab companion sk-71

Table of Contents