Unpacking Instructions; Installation Instructions - Cecilware GB5MF-IT Operation Manual

Gourmet multi-flavor dispensers
Table of Contents

Advertisement

UNPACKING INSTRUCTIONS

Carefully unpack the GB Machine and inspect immediately for shipping damage. Your GB Machine was shipped in a carton designed to give it
maximum protection in normal handling. It was thoroughly inspected before leaving the factory. In case of damage, contact the shipper, not
Cecilware.

INSTALLATION INSTRUCTIONS

Water Inlet Connection:
This equipment is to be installed to comply with the applicable Federal, State, or local plumbing codes having jurisdiction. In addition:
1.
A quick disconnect water connection or enough extra coiled tubing (at least 2x the depth of the unit) so that the machine can be moved for
cleaning underneath.
2.
An approved back flow prevention device, such as a double check valve to be installed between the machine and the water supply.
The GB beverage dispenser is equipped with a 3/4" Garden Hose Connector which is located on the back of the unit.
HIGHLY RECOMMENDED:
A WATER SHUT-OFF VALVE and A WATER FILTER, preferably a combination Charcoal/ Phosphate Filter, to remove odors and inhibit lime and
scale build up in the machine.
Note: In areas with extremely hard water, a water softener must be installed in order to prevent a malfunctioning of the equipment and
in order not to void the warranty.
After the machine has been unpacked and placed on a counter, pull out the drip tray. It should contain the following:
A Set of 4 Adjustable Leveling Legs and a ¼" Flare Water Inlet Fitting.
START-UP PROCEDURE
1.
Connect the ¼" dia. copper waterline to the ¼" flare water inlet fitting of the valve.
2.
Plug the power cord into a proper receptacle.
3.
Activate the Power Switch (Toggle Up) located on the right side of the splash panel behind the door.
The power switch controls all power to the machine including the heater elements.
The door display panel will light up and the tank will start filling.
The LCD window will display this message briefly "CECILWARE, DISPENSER V#.## ".
4. The LCD window will display this message "Low Water Level". Allow approximately 3 to 5 minutes for the tank to fill.
If the tank does not fill up within the first 5 minutes an error message will appear in the LCD window [SYSTEM ERROR, FILL
RESPONSE].
See Definition of Screen and Troubleshooting Guide.
5.
The LCD window will display this message "Low Water Temp." Allow up to 30 minutes for the water to reach a temperature of
190°F.
The heat up time will depend on the water inlet temperature, the input voltage and the wattage of the elements in the machine.
While the tank is heating up, remove the hoppers, load them with products and reposition them back in the machine. Be sure to
reposition the hoppers so that the 1/4" pin slides into the hole of the compartment base.
When the machine has reached the proper dispensing temperature, the LCD window will display, "Press & Release to Dispense"
and "Please select choice of Drink".
1

Advertisement

Table of Contents
loading

Table of Contents