EAS Electric ETH-80VM Installation & Owner's Manual page 195

Thermal monoblock
Table of Contents

Advertisement

Installation menu
1 DHW MODE SETTING
2 COOL MODE SETTING
3 HEAT MODE SETTING
4 AUTO MODE SETTING
5 TEMP. TYPE SETTING
6 ROOM THERMOSTAT
7 OTHER HEATING SOURECE
8 HOLIDAY AWAY SETTING
9 SERVICE CALL
10 RESTORE FACTORY SETTINGS
11TEST RUN
12 SPECIAL FUNCTION
13 AUTO RESTART
1 DHW MODE SETTING
1.1 DHW MODE
1.2 TANK HEATER
1.3 DISINFECT
1.4 DHW PRIORITY
1.5 DHW PUMP
2 COOL MODE SETTING
COOL MODE
T1S RANGE
T4CMAX
T4CMIN
dT1SC
dTSC
t_INTERVAL_C
3 HWAT MODE SETTING
HEAT MODE
T1S RANGE
T4HMAX
T4HMIN
dT1SH
dTSH
t_INTERVAL_H
4 AUTO MODE SETTING
T4AUTOMIN
T4AUTOMAX
5 SPACE TEMPER. SETPOINT
WATER TEMPER
ROOM TEMPER.
6 ROOM THERMOSTAT
ROOM THERMOSTAT
7 OTHER HEATING SOURCE
7.1 H.B. HEATER
7.2 AHS
SOLAR ENERGE
8 HOLIDAY AWAY SETTING
T1S H.A. H
T5S H.M. DHW
9 SERVICE CALL
PHONE NO.
MOBILE NO.
11 TEST RUN
AIR PURGE
PUMP RUNNING
COOL MODE RUNNING
HEAT MODE RUNNING
DHW RUNNING
12 SPECIAL FUNCTIONG
12.1 AIR PURGE
12.2 RREHEATING FOR FLOOR
12.3 FLOOR DRYING UP
13 AUTO RESTAR
COOL/HEAT MODE
DHW MODE
19
1.1 DHW mode
dT5 on
dT1S5
T4DHWMAX
T4DHWMIN
t INTERVAl DHW
1.2 tank heater
dT5 TBH OFF
T4 DHW ON
t DHW DELAY
1.3 DISINFECT
T5S DI
t DI hightemp.
t DI max
1.4 DHW PRIORITY
t DHWHP MAX
t DHWHP RESTRICT
1.5 DHW pump
TIMER YUNNING
DISINFECT
PUMP RUNNING TIME
7.1 HYDRO-BOX HEATER
HEAT MODE
DHW MODE
T4 IBH ON
Td1 IBH ON
t IBH DELAY
t IBH12 DELAY
7.2 AHS
HEAT MODE
DHW MODE
T4 AHS ON
dT1 AHS ON
dT1 AHS OFF
t AHS DELAY
12.2 PREHEATING FOR FLOOR
FLOW SET TEMPERATURE
RETURN TEMPERATURE
PREHEATING TIME
OPERATE PREHEATING FOR FLOOR
12.3 FLOOR DRYING UP
DRYING UP TIME
HIGE TEMP. TIME
DRYING DOWN TIME
PEAK TEMPERATURE
START TIME
START DATE
OPERATE FLOOR DRYING UP
V.2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eth-110vmEth-125vmEth-140vmEth-160vm

Table of Contents