EAS Electric ETH-80VM Installation & Owner's Manual page 102

Thermal monoblock
Table of Contents

Advertisement

Application c
Boiler provide heat for space heating and domestic water heating, but the boiler and outdoor unit are connect in series.
If application c is selected, the control cable connect to the boiler should also connect to the 3-way valve (25), that is to say the 3-way valve(25)
and boiler should work simultaneously.
1
1.6 1.7
1.8
1.5
1.3
1.2
1.4
1 outdoor unit
1.1 manometer
1.2 pressure relief valve
1.3 expansion vessel
1.4 plate heat exchanger
1.5 backup heater
1.6 air purge valve
1.7 flow switch
1.8 P_i: circulation pump inside
the unit
2
y-shape filter
3
stop valve (field supply)
4
user interface
6
drain valve(field supply)
7
fill valve(field supply)
If the volume of balance tank(9) is larger than 30L, the buffer tank(8) is unnecessary, otherwise the buffer tank(8) should be installed and
total volume of balance tank and buffer tank should larger than 30L.
For the 5/7/9kW unit, the backup heater (1.5) is not integrated in the outdoor unit. An independent backup heater can be selected and installed
in the door.
Temperature sensor T1B must be installed at the outlet of AHS, and connect to the corresponding port in the main control board of
hydraulic module(refer to
9.2.3 Main control board of hydraulic module)
Operation
When heating is required, either the unit or the boiler starts operating, depending on the outdoor temperature (refer to 10.7 field setting/OTHER
HEATING SOURCE).
■ As the outdoor temperature is measured via the outdoor unit air thermistor, make sure to install the outdoor unit in the shade, so that it is not i
influenced by the sun's heat.
■ Frequent switching can cause corrosion of the boiler at an early stage. Contact the boiler manufacturer.
■ During heating operation of the unit, the unit will operate to achieve the target water flow temperature set on the user interface. When weather
dependent operation is active, the water temperature is determined automatically depending on the outdoor temperature.
AHS
17
23
19
25
1.1
2
3
6
7
8
buffer tank(field supply)
9
balance tank(field supply)
9.1 air purge valve
9.2 drain valve
10
expansion vessel(field supply)
11
P_o: outside circulation pump
(field supply)
12
collector(field supply)
13
domestic hot water tank
supply)
13.1 booster heater
13.2 heat exchanger coil
13.3 air purge valve
14
T5:temperature sensor
15
hot water tap(field supply)
NOTE
13
4
13.3
14
13.1
13.2
10
24.1
9.1
11
9
8
24
9.2
16
17
19
23
supply)
24
24.1 P_c: mixing pump
25
FHL 1...n floor heating loop
(field
AHS
source(boiler)
. The drain valve (6) should be installed at the lowest positon of the system.
.
13
15
16
17
17
12
.......
FHL1
FHL2
P_d: DHW pump(field supply)
non-return valve(field supply)
SV1: 3-way valve(field supply)
T1B: temperature sensor(field
mixing station(field supply)
3-way valve(field supply)
additional heating
V.2
FHLn
the

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eth-110vmEth-125vmEth-140vmEth-160vm

Table of Contents