2. Connect the power cables from the AC distribution box to the PV Inverter.
Maximum No. of conductor
AC Terminal
AC Cable
(Cu)
The minimum requirement of individual cable size and numbers for each phase AC cable.
AC Cable
(Al)
The minimum requirement of individual cable size and numbers for each phase AC cable.
The detailed dimension of AC bottom plate can refer to Appendix B.
CAUTION! RISK OF SHORT CIRCUIT AND FIRE!
- The working temperature of power cable should be at least 105°C.
- To avoid damage of cables, please install the movable bushing to the DC & AC side
!
bottom plate before wiring. (Please refer to Appendix B for installing procedure)
- To prevent moisture, dust or living creature from entering the case, please seal the
DC & AC side bottom plate with high temperature resistance and water-proof
material (Ex: fire retardant cable sealant or silicon)
Need to use moving bushing and silicon rubber for waterproof and dust.
The recommended material of movable bushing and silicon rubber is shown as below:
Component
Movable bushing
Silicon rubber
C1000
for each phase
8 (<300 mm
2
)
Minimum total cable size requirement for each phase
Minimum total cable size requirement for each phase
NOTE
NOTE
Part number
1010-12
RTV162
Screw/Nut size
M12
1110 mm
2
150 mm
2
x 8
1480 mm
2
185 mm
2
x 8
Vendor
EMKA
GE Bayer Silicones
33
Installation
Torque requirement
(Nm)
45