Pe Connection - Delta C1000 Operation And Installation Manual

Photovoltaic inverter
Table of Contents

Advertisement

Installation

4.6 PE Connection

There are two positions that can be connected to PE.
a. Inverter inside. Connect PE to the busbar in AC or DC side.
b. Inverter outside. Connect PE to the inverter holder.
AC side
DC side
(a)
(b)
Figure 4-13 : PE Connection (a) inverter inside; (b) inverter outside
40

Advertisement

Chapters

Table of Contents
loading

Table of Contents