3 Transportation & Installation Preparation; Installation Site Requirements; Site Space - Delta C1000 Operation And Installation Manual

Photovoltaic inverter
Table of Contents

Advertisement

3 Transportation & Installation Preparation

3.1 Installation Site Requirements

3.1.1 Site Space

Make sure the room for system loading and the destination installation site meet
the space requirements described in this section.
The loading site should provide enough space to unpack the entire system and
release the container. See the following dimensions:
• Height of the package: 2210 mm (87 inches)
• Width of the package: 2280 mm (89.8 inches)
• Depth of the package: 1200 mm (47.2 inches)
• Height of the system: 1980 mm (78 inches)
• Width of the system: 2100 mm (82.7 inches)
• Depth of the system: 950 mm (37.4 inches)
- The ambient temperature range of installation site must be less than 60°C.
- Direct solar irradiation may reduce the output power of the central inverter.
Figure 3-1 : Inverter Space Requirements
NOTE
17
Transportation & Installation Preparation

Advertisement

Chapters

Table of Contents
loading

Table of Contents