Preparing The Installation Site; Dimensions Of Trench; Dimensions & Characteristics Of The Base - Delta C1000 Operation And Installation Manual

Photovoltaic inverter
Table of Contents

Advertisement

Transportation & Installation Preparation

3.2 Preparing the Installation Site

Prior to unpacking the system, make sure that you read and understand all
environmental and space requirements.

3.2.1 Dimensions of trench

Prepare a trench for laying cables from DC and AC distribution box safely. The
suggested width of trench is 250mm (shaded area in Figure 3-2) and the
suggested depth is depended on user.
unit: mm
3.2.2 Dimensions & Characteristics of the base
Build an installation base using the dimensions from the following illustration.
The width and depth of the metal base should not be smaller than the inverter,
and make sure the base can hold at least the weight of the inverter.
170
Mounting Hole
14
Figure 3-2 : Trench Dimensions
590
Figure 3-3 : Installation Base Dimensions
2100
580
18
590
unit: mm