Intec ARGUS Manual page 68

Pri
Table of Contents

Advertisement

4 Operation on a PRI Access
An example of
the display
Tests
1/02
The connection
There are
was the first
currently 2 active
started
connections or
tests
If a test (or connection) is canceled or cleared, the ARGUS will return to the Test Manager
if there is another test (or connection) running in the background.
Some tests use so many resources that they cannot be run in every combination
with other tests. In this case, the ARGUS will display the message "Test not
possible at this time".
Test/
Connection display.
Incoming call
Outgoing call
BERT
Loop
Service tests
Suppl.serv.test
Time measurement
CF Interrogation /
Active / Clear
68
B01
The connection
uses B-channel 1
Number of times that a test or connection
can be started at the same time
30
30
2
2
1
1
1
1
Switching to
another test is
possible
Yes
Yes
Yes
Yes
No
No
No
No
ARGUS PRI

Advertisement

Table of Contents
loading

Table of Contents