Managing Multiple Tests On A Pri Access - Intec ARGUS Manual

Pri
Table of Contents

Advertisement

4 Operation on a PRI Access

4.14 Managing Multiple Tests on a PRI Access

The ARGUS can simultaneously start several tests or "connections" independently of each
other. As an example, a BERT can be run at the same time that you make a phone call.
The individual tests or "connections" use resources.
All of the tests that have been started will be administered by the Test Manager. Using the
Test Manager, you can start new tests, switch between tests running in parallel or terminate
all of the tests that are currently running.
Test Manager
66
The ARGUS – Main menu
Open the Test Manager
Opens the Test Manager directly
<TM>
or
in the Single tests menu if a
connection has already been 
setup or if the ARGUS is running
a test.
ARGUS PRI

Advertisement

Table of Contents
loading

Table of Contents