4 Operation on a PRI Access
4.14 Managing Multiple Tests on a PRI Access
The ARGUS can simultaneously start several tests or "connections" independently of each
other. As an example, a BERT can be run at the same time that you make a phone call.
The individual tests or "connections" use resources.
All of the tests that have been started will be administered by the Test Manager. Using the
Test Manager, you can start new tests, switch between tests running in parallel or terminate
all of the tests that are currently running.
Test Manager
66
The ARGUS – Main menu
Open the Test Manager
Opens the Test Manager directly
<TM>
or
in the Single tests menu if a
connection has already been
setup or if the ARGUS is running
a test.
ARGUS PRI