Commissioning - WAGNER TOPFINISH DD10 Translation Of The Original Operating Manual

Pneumatic double diaphragm pump
Hide thumbs Also See for TOPFINISH DD10:
Table of Contents

Advertisement

VERSION 09/2016
OPERATING MANUAL
6.8

COMMISSIONING

6.8.1
SAFETY INSTRUCTIONS
Every time before starting up, the following points should be observed as laid down in
the operating manual:
- Observe all safety regulations in accordance with Chapter 4.
- Carry out commissioning properly.
Toxic and/or fl ammable vapor mixtures!
Risk of poisoning and burns.
Gas mixtures can explode if there is an incompletely filled pump!
Danger to life from fl ying parts.
6.8.2
PRELIMINARY OPERATIONS
Impurities in the spraying system!
Spray gun blockage.
Flush the spray gun and paint supply with a suitable fl ushing agent before
commissioning.
ORDER NUMBER DOC 2366672
WARNING
Operate the device in a spray booth approved for the working
materials.
-or-
Operate the device on an appropriate spraying wall with the
ventilation (extraction) switched on.
Observe national and local regulations for the exhaust air speed.
WARNING
Ensure that the pump and suction system are always completely
filled with cleaning agent or working medium.
Do not spray the device empty after cleaning.
NOTICE
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

8286

Table of Contents