Function Test After The Repair - WAGNER TOPFINISH DD10 Translation Of The Original Operating Manual

Pneumatic double diaphragm pump
Hide thumbs Also See for TOPFINISH DD10:
Table of Contents

Advertisement

VERSION 09/2016
OPERATING MANUAL
11

FUNCTION TEST AFTER THE REPAIR

After all repairs, the device must be checked for safe condition before recommissioning.
The necessary scope of inspection and testing depends on the repair carried out and must
be documented by the repair staff .
Activities
1.1 EX-relevant inspections
-
Check mass connection between grounding connection of the pump
and the frame/trolley and between the individual components of the
frame/trolley: <100kΩ
!! These inspections are
1.2 Testing for Leaks
-
Connect the pump to the air supply 6 bar. To perform a leak test on the
device, the product pressure with the fl ushing agent is slowly increased
in increments until the maximum pressure indicated on the type plate
is reached. Close pump outlet. Allow to stand in this position for 0.5-1
minute and listen for audible blowing off . Close air-supply ball-valve
without relieving and check for pressure-loss.
1.3 General Inspections
-
Check tightening torque of various screws.
-
Check all threaded connections.
-
Empty the device completely and relieve pressure.
-
Check function of frame or transport trolley.
ORDER NUMBER DOC 2366672
- relevant!!
Aid tools
Ohmmeter
Air motor:
Test medium com-
pressed air
Leak spray
Fluid section:
Test medium: suitable
fl ushing agent
Torque wrench
Visual check
41

Advertisement

Table of Contents
loading

This manual is also suitable for:

8286

Table of Contents