Test Cell Removal

Figure 4
Front View with Door Removed
The detector is shipped from the factory with the door removed
and a test cell installed, which does not have connections for
solvent. Before using the detector with solvents, the test cell must
be removed and a flow cell must be installed.
Loosen the holding screws to remove the test cell. Store the installed
test cell after removal as it is used when testing the lamp.

Flow Cell Installation

1. Insert the flow cell holder in the flow cell
compartment on the front of the detector.
2. Tighten the holding screws.
Figure 8
Tighten the Holding Screws
12
InSTALLATIon
|
VERITY® 1741 UV-VIS DETEcToR
Figure 6

Test Cell Removal

Figure 7
Flow Cell Installation in the Flow Cell