Pre-Installation Checklists; Unpacking And Inspection Checklist; Analyzer Space Checklist; Installation Configuration Checklist - Micromeritics ACCUPYC III Pre-Installation Instructions

Gas displacement pycnometer
Hide thumbs Also See for ACCUPYC III:
Table of Contents

Advertisement

3 P
-
RE
INSTALLATION
For each question, circle Y if the condition applies to your laboratory or N if it does not. When this
Pre-installation Checklist has been completed, see
and date the form, then send it along with all completed checklists to Micromeritics.
U
NPACKING AND
Unpacking and Inspection
Have the shipping cartons been unpacked and their contents
inspected?
Was there any shipping damage?
If Yes, has a claim been filed with the freight carrier?
n
Were all items on the packing list received?
If No, has Micromeritics been notified?
n
A
S
NALYZER
PACE
Analyzer Space
Can the lab area where the analyzer and computer will be placed
accommodate the combined dimensions of the analyzer and any
accessories, peripheral devices (such as a printer), or computer
(when applicable)?
Will there be adequate space to easily access the gas lines,
power supply lines, and sufficient clearance for maintenance and
inspection?
I
C
NSTALLATION
Gas and Gas Supply Lines
Will 1/8 in. copper gas supply lines (supplied with the analyzer for
standard installation) be used?
If No, have 1/8 in. stainless steel gas supply lines been ordered
n
and received from Micromeritics?
AccuPyc III Pre-installation Instructions and Checklist
135-42870-01 (Rev -) — Nov 2023
C
HECKLISTS
I
C
NSPECTION
HECKLIST
C
HECKLIST
C
ONFIGURATION
Dates and Signatures on page 1 -
Y
Y
Y
Y
Y
Y
Y
HECKLIST

3 Pre-installation Checklists

3. Sign
Initial / Date
N
N
N
N
N
Initial / Date
N
N
Initial / Date
Y
N
Y
N
3 - 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ACCUPYC III and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents