Table Of Contents - Lopi ProBuilder 24 CleanFace GSR2 Installation Manual

Hide thumbs Also See for ProBuilder 24 CleanFace GSR2:
Table of Contents

Advertisement

Overview ................................................................... 2
Installation Options .................................................. 6
Heating Specifications ............................................. 6
Dimensions ............................................................... 6
Packing List .............................................................. 7
Additional Items Required ....................................... 7
Optional Equipment Installation ............................. 7
Fireplace Placement Requirements ....................... 8
Clearances ......................................................................8
Raised Fireplaces ............................................................8
Minimum Framing Dimensions ............................... 9
Nailing Brackets ....................................................... 11
Standard vs. Extended Position ............................. 12
Header and Pipe Shield Installation ....................... 13
Corner Installations .................................................. 16
Outdoor fireplace installations ............................... 18
Gas Line Requirements ........................................... 19
Fuel .................................................................................19
Gas Line Connection .......................................................19
Gas Inlet Pressure ...........................................................19
Gas Line Location ............................................................20
Electrical Connection ............................................... 21
Vent Requirements ................................................... 22
Vent Clearances ..............................................................22
Vent Firestop or Thimble .................................................22
Altitude Considerations ....................................................22
Approved Termination .....................................................22
Approved Vent .................................................................22
Vent Installation ...............................................................23
Exhaust Restrictor Position..............................................23
Diffuser ............................................................................24
Intake Restrictor Position .................................................25
Vent Configurations ................................................. 27
Minimum Vent Configuration ...........................................27
Vent Configuration: Vertical Termination .........................28
Vertical Rise ....................................................................29
Termination Requirements ...................................... 30
Hearth Requirements ............................................... 31
Lower Trim (Optional) .............................................. 32
Removing the lower trim ..................................................32
Facing Requirements ............................................... 33
Standard vs. Extended Position .......................................34
Thick Facing Guide ..........................................................35
THICK FACING GUIDE SIZE ..........................................37
© Travis Industries

Table of Contents

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
12/17/20 - 1528
Screen Assembly Mounts ................................................ 38
Mantel Requirements ............................................... 39
Mantel Column Clearances ............................................. 39
Mantel Clearances .................................................... 40
Finalizing the Installation ........................................ 41
Pilot Flame Inspection ..................................................... 41
Air Shutter Adjustment .................................................... 42
Location of Controls ........................................................ 43
Glass Frame Removal and Installation ............................ 44
Log Set Installation .................................................. 47
Installation ................................................................. 54
Ember bed Glass Installation ........................................... 54
Ember Material Installation .............................................. 55
Ember Installation ............................................................ 55
Rock Wool Placement (All Models) ................................. 55
LP Conversion Instructions .................................... 56
Wiring Diagram - GSR2 ........................................... 59
(Optional) ................................................................... 60
CoolSmart TV - Framing the Chase ............................... 62
CoolSmart TV - Fireplace Preparation ............................ 63
3
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
PB24 CF Install (AUST)

Advertisement

Table of Contents
loading

Table of Contents