Table Of Contents; Features; Heating Specifications - Lopi ProBuilder 24 CleanFace GSR2 Manual

Hide thumbs Also See for ProBuilder 24 CleanFace GSR2:
Table of Contents

Advertisement

Table of Contents

Introduction ................................................... 2
Important Information ................................... 2
Installation Warnings .................................... 2
Table of Contents .......................................... 3
Features ......................................................... 3
Heating Specifications .................................. 3
Before You Begin .......................................... 6
Remote Control Warnings .................................... 6
Remote Set-Up ............................................... 7
Clearing the System Memory ............................... 7
Location of Controls ..................................... 8
Direct Operation ............................................ 8
Pilot Fuel Conservation Timer ..................... 9
Remote Operation ....................................... 10
Display Overview............................................. 10
Standard Thermostat .................................. 11
Light)............................................................. 12
Flame Height ....................................................... 12
Blower Speed ..................................................... 12
Mode Controls - continued ......................... 13
EmberBed Light (AUX) ......................................... 13
Display Fahrenheit or Celsius .................... 13
Low Battery Indicator.................................. 13
Transmitter Batteries ...................................... 13
IFC Batteries .................................................... 13

Features

Works During Power Outages
Contemporary Look
Remote Thermostat

Heating Specifications

Approximate Heating Capacity (in square meters)*
ProBuilder
24 CF
Maximum Input Per Hour (MJ/H)
*
Heating capacity will vary with floor plan, insulation, and outside temperature.
© Travis Industries
Introduction
Battery Replacement .................................. 14
Opening the Battery Box ................................ 14
Battery Installation .......................................... 14
Transmitter Battery Installation ..................... 14
Child-Proof Feature .................................... 14
Normal Operating Odors ............................ 15
Power Outages ............................................ 15
Glass Removal ............................................ 17
Installation Warnings ......................................... 19
Installation ................................................... 26
Ember bed Glass Installation ............................ 26
Ember Material Installation ................................ 27
Ember Installation.............................................. 27
Rock Wool Placement (All Models) ................... 27
Cleaning The Glass .............................................. 28
Cleaning the Fireplace ......................................... 28
Bulb Replacement ....................................... 29
Yearly Service Procedure ........................... 30
Troubleshooting Table ............................... 31
Replacement Parts List .............................. 32
Wiring Diagram ........................................... 33
Safety Label ...................................................... 34
CONDITIONS & EXCLUSIONS ................... 35
Index ............................................................. 36
5/3/21 - 1529
Standing or Intermittent (GreenSmart) Pilot
Variable-Rate Heat Output
Low Maintenance
Natural Gas
Up to 70
19.89
PB 24 CF GSR2 Operation (AUST)
3
Propane
Up to 70
18.5

Advertisement

Table of Contents
loading

Table of Contents