Lp Conversion Instructions - Lopi ProBuilder 24 CleanFace GSR2 Installation Manual

Hide thumbs Also See for ProBuilder 24 CleanFace GSR2:
Table of Contents

Advertisement

56

LP Conversion Instructions

WARNING
This conversion kit shall be installed by a qualified service agency in accordance with the
manufacturer's instructions and all applicable codes and requirements of the authority having
jurisdiction. If the information in these instructions is not followed exactly, a fire, explosion, or
production of carbon monoxide may result causing property damage, personal injury, or loss of life.
The qualified service agency is responsible for the proper installation of this kit. The installation is not
proper and complete until the operation of the converted appliance is checked as specified in the
manufacturer's instructions supplied with the kit.
CAUTION:
The gas supply shall be shut off prior to disconnecting the electrical power, before
proceeding with the conversion.
NOTE:
Convert the appliance prior to installing the gas line to ensure proper gas use.
The GSR Stepper Motor Kit (4-pack = 94400999, single = 250-01463) is required for converting this
appliance to LP. The kit contains the stepper motor (regulator) and Torx wrench. The burner
orifices, pilot orifice, and burner gaskets are shipped with the appliance.
1. Remove the barrier and glass. Remove the logs and embers (if installed - page 47)
2. Remove the burners following the directions below.
Lift the rear burner and lift it from the firebox. The burner has a bracket that inserts over two pins
behind the burner. When replacing the burner make sure it is properly located.
© Travis Industries
Installation
(for qualified installers only)
12/17/20 - 1528
PB24 CF Install (AUST)

Advertisement

Table of Contents
loading

Table of Contents