Loop Flushing Valve - JLG 800A Service And Maintenance Manual

Table of Contents

Advertisement

Loop Flushing Valve

REMOVAL
1. Using a 11/16 in internal hex wrench remove plug (1)
and (2).
12
10
8
4
1
11/16 in
27 ft.lbs.
(37 Nm)
5
1. Plug
6. O-ring
2. Plug
7. Spring
3. Plug
8. Spring
4. O-ring
9. Spring
5. O-ring
10. Washer
Figure 3-9. Loop Flushing Spool
3121628
6
9
11
11/16 in
27 ft.lbs.
(37 Nm)
13
7
5/8 in
3
20 ft.lbs.
(27 Nm)
11. Washer
12. Shift Spool
13. Orifice Poppet
2. Using a 1/4 in hex wrench remove plug (3).
3. Remove O-rings (4, 5, and 6).
4. Using pliers, remove centering springs (7, 8, and 9).
5. Remove spring retaining washers (10 and 11).
6. Remove shift spool (12).
7. Remove orifice poppet (13).
INSPECT THE COMPONENTS
2
Inspect new O-rings and the sealing area for rust, wear, or con-
tamination. Also check springs and poppet for wear.
INSTALLATION
1. Install orifice poppet (13).
2. Install shift spool (12).
3. Install spring retaining washers onto springs (10 and 11).
4. Carefully install centering springs (7, 8, and 9).
5. Install new O-rings (6, 4, and 5).
6. Using a 1/4 in hex wrench torque plug (3) to 20 ft. lbs.
(27 Nm).
7. Using a 11/16 in internal hex, torque plugs (2 and 1) to
27 ft.lbs. (37 Nm).
SECTION 3 - CHASSIS & TURNTABLE
3-19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

800aj

Table of Contents