Optical multiplexers
Procedure steps
1. Support the chassis so that all of the mounting holes in the optical shelf align with
2. Attach two rack mounting bolts to each side of the rack.
3. Tighten all of the bolts in rotation.
54
Installation — SFP, SFP+, XFP, and OADM Hardware Components
the corresponding holes in the rack.
Comments? infodev@avaya.com
August 2013