Installation

4.1
General installation information
A residual current circuit breaker must be provided as electrical protection for the system.
The system's control unit must be positioned in such a way as to prevent any unauthorised use.
Consequential damage can occur in the building if the system is switched off accidentally.
Assembly sequence
(1)
Installation of the technical module.
(2)
Connection of wastewater inlet and the pressure
pipe via which the wastewater is pumped out.
(3)
Installation of the chamber module
(not described in these instructions).
4.2
Attaching the pump clamp
Pump with threaded connection
Screw the pump clamp (2) to the pump and secure using
the grub screw (3).
Make sure that the seal (1) has been placed in the pump
clamp (2).
010-992_01
(4)
(5)
Pumping station / Installation and operating manual
Installation of cable conduit, ventilation,
control unit and electrical connection.
Commissioning
33 / 124