Power Up (cont'd)
4.) Press the ON/OFF key at the front of the System once.
5.) After initialization is complete, all lighted buttons on the Control Panel light and the default B-Mode
screen or Patient screen (no probes are connected) is displayed on the monitor display.
4-2-2-2
Power Up Sequence
1.) The Start Up Screen will be shown on the Monitor display when the system is turned ON.
4-2-2-3
Entering the Maintenance Mode
Purpose: This is a description on how to enter the maintenance mode.
1.) Insert the service dongle into any USB port.
2.) Wait for scanner boot-up.
3.) Tap ON/OFF the power switch.
3
ON/OFF Switch
Figure 4-12 Power On/Off Standby Switch Location