Riello Start Condens 25 KIS Installer And User Manual page 24

Hide thumbs Also See for Start Condens 25 KIS:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 21
START CONDENS 25 - 29 Kis
During manufacture, the boiler is configured for standard systems.
Jumper
Description
JP1
Calibration (Range Rated)
JP2
Heating timer reset
JP3
Calibration (see paragraph "Adjustments")
JP4
Absolute domestic hot water thermostat selector
JP5
Do not use
JP6
Enable night-time compensation and continuous pump
function (only with outdoor probe connected)
JP7
Enable standard system/low temperature management
(see above)
JP8
Do not use
2.8 - Gas connection
The connection of the START CONDENS Kis boiler to the gas supply
must be carried out in the respect of current installation standards.
Before carrying out the connection, it is necessary to ensure that:
• The gas type is suitable for the appliance
• The piping is thoroughly clean.
9 The gas feeding system must be adapted to the boiler output
and must be equipped with all the safety and control devices pre-
scribed by the current standards. The use of a filter of adequate
dimensions is recommended.
9 Once the installation is done, check that the junctions carried
out are sealed.
2.9 - flue gas outlet and combustion air suction
9 The maximum lengths of the ducts refer to flue systems availa-
ble in the catalogue.
67,5
135
Suction/discharge pipes length table
Maximum straight
Flue gases pipe
Ø 80 mm ("forced open"
installation) (type B23P-
B53P)
Concentric pipe
Ø 60-100 mm (horizontal)
Concentric pipe
Ø 60-100 mm (vertical)
Concentric pipe
Ø 80-125 mm
Twin pipe Ø 80 mm
45+45 m 40+40 m
9 The straight length measurement is inclusive of the first bend
(boiler connection), terminals and joints; with the exception of
the vertical coaxial duct Ø 60-100 mm, where the straight length
does not include the bends.
9 It is compulsory to use specific pipes.
9 The non insulated flue gas outlet pipes are potential sources of
danger.
9 The use of a longer pipe causes a loss of output of the boiler.
9 Make sure the flue gas discharge pipe is tilted 3° towards the
boiler.
72
130,5
Pressure drop
length
25 Kis
29 Kis
bend 45° bend 90°
70m
65m
1m
5.85m
4.85m
1.3m
6.85m
5.85m
1.3m
15.3m
12.8m
1m
1m
Flue gases pipe Ø 80 mm ("forced open" installation) (type
B23P-B53P)
The appropriate adaptor kit must be installed for this configuration.
The concentric pipes can be fitted in most suitable direction in rela-
tion to installation requirements. For installation, follow the instruc-
tions supplied with the specific kit for condensing boilers.
Concentric pipes ø 60-100mm
Twin pipes ø 80mm
Air inlet adaptor kit
Ø 80 mm
1.5m
Maximum pipe length Ø 80 mm - 25 KIS
80
1.6m
70
1.6m
60
50
1.5m
40
1.5m
30
20
10
0
0
5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110
24
130
Air inlet adaptor kit
from Ø 60 mm to
Ø 80 mm
Length of suction pipe (m)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Start condens 29 kis2011490520114907

Table of Contents