Running a Job on PSV5000 ■ List of Steps to Start a Job

Power Up the Tray Feeder

1. Ensure the Tray Feeder 35 utilities are plugged into the
PSV5000 Machine and the Tray Feeder power switch is in the ON posi-
tion. The Tray Feeder powers up when the PSV5000 Machine is started.
2. To verify power, ensure the top sensors have lights (indicating power).
Figure 46: Verify sensor lights.

Verify Tray Feeder Initialization

1. Install up to 20 JEDEC trays of unprogrammed devices into the Input
Stack of the Tray Feeder.
2. Run your job in TaskLink or LumenX Data Management Software.
3. After CH700 starts, click the In and Out buttons to enable Tray 1 for Input
and Output.
Figure 47: Enabling Tray 1 for Input and Output.
4. In the right pane, click System, and enter the Supervisor password.
- 46 -
Data I/O ■ 096-0466-001E

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PSV5000 and is the answer not in the manual?

Questions and answers

Related Products for Data I/O PSV5000

Table of Contents