Running a Job on PSV5000 ■ List of Steps to Start a Job
1>> Checking the System
PSV5000 Machines
must be level and at
room temperature
before running a job.
2>> Installing Input/Output Media
Regardless of input
media used (trays or
tape), all should offer
devices right-side-up
('live bug' orientation.)
- 14 -
Before you set up for your job, check that:
• All side panels and doors are closed
• No one is working on the machine.
• The external air line is connected.
If the power and air pressure switches are already ON, the
pressure indicator number should be green.
Some optional equipment needs to be set up or their settings checked and
power turned ON, or a process started (even if the equipment was installed
by another individual, such as the administrator).
CAUTION:
strap or discharge static against a common ground to prevent damage
to Socket Adapters and devices.
Safety hazard! Possible personal injury from moving
CAUTION:
machinery. Always make sure that the PNP head is stopped in the Park
or Tool position before opening any access doors.
These input/output media are described in this section:
• Static Trays (next heading)
• Tape Feeder Input
• Tape Output
For the Tray Feeder input, see Setting Up an Automatic Tray Feeder in the
PSV5000 Owner's Manual.
If your job or work process uses other options such as a Barcode Scanner,
make sure they are installed and ready. Check with your administrator or
see the PSV5000 Owner's Manual.